Route Study

ColumBUS Transit Improvement and Expansion Plan

In April of 2013, CAMPO began a study to look at the route system and determine if we improve on the existing routes and possibility increase the frequency and the area of Columbus that is currently covered.  Numerous public meetings were held with stakeholder groups and citizens in April.  These meetings are summarized in the Draft Final Plan below.  A thorough rider survey was also done, along with a web survey that was available to the public, and a Cummins employee survey.

This study, which is still on-going, is being led by the Transit Advisory Committee

Draft Final Plan - June 24, 2014

Public Web Survey - Results

Cummins Employee Survey - Results

 

©2014 City of Columbus Indiana | Contact Us | Site Map | Website Credits