200 South Photos

Click on photos for a full size picture.

  • Striping Placement

    Striping Placement

  • Completed 150W Intersection

    Completed 150W Intersection

  • Placing Surface

    Placing Surface

  • Placing Final Concrete Drive Approach

    Placing Final Concrete Drive Approach

  • Placing Surface

    Placing Stage VI Surface

  • Stage IV HMA Base

    Stage VI HMA Base

  • Stage IV HMA Base

    Stage IV Curb and Gutter Placement

  • Placing Stage IV Subgrade

    Placing Stage IV Subgrade

  • Stage IV Storm Laterals

    Stage IV Storm Laterals

  • Milling Cty Road 150W

    Milling Cty Road 150W

  • Placing Sidewalk at Spear Street

    Placing Sidewalk at Spear Street

  • Placing Stage II & III Driveway Approaches

    Placing Stage II & III Driveway Approaches

  • Placing Sod

    Placing Sod

  • Spear Street Intersection

    Spear Street Intersection

  • Placing HMA base

    Placing HMA base

  • Spear Street Intersection HMA Base Placement

    Spear Street Intersection HMA Base Placement

  • Stage III HMA Base

    Stage III HMA Base

  • Stage 3 sub-grade prep

    Stage 3 sub-grade prep

  • Excavation

    Excavation

  • Completed excavation to sub-grade at Spear Street

    Completed excavation to sub-grade at Spear Street

  • Installation of Storm Inlet Lateral at Spear Street

    Installation of Storm Inlet Lateral at Spear Street

  • Sidewalk Placement

    Sidewalk Placement

  • Temporary Striping - East End

    Temporary Striping - East End

  • Placing HMA base

    Placing HMA base

  • Sidewalk Placement

    Sidewalk Placement

  • Railroad Crossing Signal Installation

    Railroad Crossing Signal Installation

  • Railroad crossing panels

    Railroad crossing panels

  • Southside Drive approach

    Southside Drive approach

  • Placing curb radius at CR 130W

    Placing curb radius at CR 130W

  • Placing curb and gutter

    Placing curb and gutter

  • HMA Base

    HMA Base

  • Paving operation - start of westbound lane

    Paving operation - start of westbound lane

  • Compacted subgrade

    Compacted subgrade

  • Stone base placement & compaction

    Stone base placement & compaction

  • Sub-grade prep & grid placement

    Sub-grade prep & grid placement

  • Road excavation & grading

    Road excavation & grading

  • Installation of storm piping laterals

    Installation of storm piping laterals

  • Installation of inlet structure & piping

    Installation of inlet structure & piping

  • Installation of final Stage II MH structure

    Installation of final Stage II MH structure

  • Installation of new storm structure

    Installation of new storm structure

  • Current 200S condition looking west

    Current 200S condition looking west

  • Curb Inlet structure

    Curb Inlet structure

  • Installation of storm piping & structures

    Installation of storm piping & structures

  • Milling existing road

    Milling existing road

  • Manhole Structure adjacent to relocated utility pole

    Manhole Structure adjacent to relocated utility pole

  • Preparation for placement of manhole

    Preparation for placement of manhole

  • Manhole Structure

    Manhole Structure

  • Storm piping backfilled & graded

    Storm piping backfilled & graded

  • Outfall at Opossum Creek

    Outfall at Opossum Creek

  • Storm piping installation

    Storm piping installation

  • Storm piping installation

    Storm piping installation

  • Clearing Right of Way

    Clearing Right of Way

©2014 City of Columbus Indiana | Contact Us | Site Map | Website Credits