Woodside Area Paving

The City Engineer’s Office is preparing plans for the full depth reclamation (FDR) and repaving of several streets in Woodside and Woodside South.  The FDR process utilizes all of the existing pavement and stone base to produce a pavement structure that better handles the heavy truck traffic in the area.  The project is scheduled to begin in June.

 

©2014 City of Columbus Indiana | Contact Us | Site Map | Website Credits