Section 13.16.150 Wastewater discharge permit modification.

    A.    The director may modify the wastewater discharge permit for good cause including, but not limited to, the following:
    1.    To incorporate any new or revised federal, state or local pretreatment standards or requirements;
    2.    To address significant alterations or additions to the industrial user's operation, processes or wastewater volume or character since the time of wastewater discharge permit issuance;
    3.    A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;
    4.    Information indicating that the permitted discharge poses a threat to the city's POTW, city personnel or the receiving wasters;
    5.    Violation of any terms or conditions of the wastewater discharge permit;
    6.    Misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required reporting;
    7.    Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13;
    8.    To correct typographical or other errors in the wastewater discharge permit;
    9.    To reflect a transfer of the facility ownership and/or operation to a new owner/operator.
    B.    The filing of a request by the permittee for a wastewater discharge permit modification does not stay any wastewater discharge permit condition. (Ord. 99-16 (part), 1999)