Chapter 13.16 SEWER SERVICE SYSTEM*
Section 13.16.180 Wastewater discharge permit reissuance.
A. A significant industrial user shall
apply for wastewater discharge permit reissuance by
submitting a complete wastewater discharge permit application a minimum of thirty days prior to
the expiration of the industrial user's existing waste discharge permit.
B. When requested, the control authority
may conduct the sampling and monitoring for the
industrial user as required in the industrial discharge permit. The industrial user may perform
sampling and monitoring "in-house" or by a contract laboratory; however, if sampling by an
industrial user indicates a violation, the industrial user, upon becoming aware of a violation, must
notify the control authority of the violation within twenty-four hours then repeat the analysis and
submit the results within thirty days.
C. Industrial users must notify the
control authority immediately of all discharges that could
cause problems to the POTW, including any slug loads.
D. The industrial user must promptly
notify the control authority in advance of substantial
changes in volume or character of discharges, including changes in any listed or characteristic
RCRA hazardous wastes discharged to the POTW. (Ord. 99-16 (part), 1999)